HYDROAIR COMPONENTS - BUFFALO, NY
posted October, 1 2007


Allied Mechanical is proud of our work on this exciting design / build project which incorporates geothermal, low intensity, radiant ceiling panels to heat and cool a new 13,000 square foot office. In addition, HydroAir recovers 1.7 million BTUs of previously wasted heat from their production process, to heat their 145,000 square foot production facility. This state-of-the-art facility also comes equipped with DDC controlled window blinds to efficiently control the solar load on the building. HydroAir continues to keep this sophisticated system operating at peak efficiency by taking advantage of Allied's Power UP! Planned Maintenance program.